Boracay (Tower 8 ) rises to the 17th floor
Finishing works including masonry, tile works and painting are ongoing at Maui (Tower 6) while installation of balcony railings are also underway in all floors of the said tower.
Masonry works are almost finished for Maldives (Tower 7) with framing and partitioning heavily underway.
In addition, concrete pouring at the 17th floor of Boracay (Tower 8 ) is ongoing. Finishing works such as masonry is underway at the 7th, 8th and 9th floors of tower.
The Azure Urban Resort Residences is a development of Century Limitless Corporation, a subsidiary of Century Properties Group. It is located in West Service Road, Marcelo Green, beside SM Bicutan in Parañaque City.