Unit inspections start at Azure’s Miami tower
Azure’s Miami residents have already started unit inspections and move-ins are expected to start soon.
The Maui (sixth tower), which was topped off last October 2015, is now undergoing wall studding and pre-cast installation in the 12th floor and 18th floors respectively while tiling works for bathroom units are heavily underway. Wall studding and the installation of pre-cast stairs for Maldives’ (seventh tower) retail space is progressing.
Meanwhile, fabrication of pre-cast stairs for Boracay’s (eight tower) retail space is ongoing while concreting works have reached the 9th level.
The Azure Urban Resort Residences is a development of Century Limitless Corporation, a subsidiary of Century Properties Group. It is located in West Service Road, Marcelo Green, beside SM Bicutan in Parañaque City.