Real Estate Philippines

Centuria Medical Makati aims to be at forefront of medical tourism boom

MANILA, Philippines - The country’s natural beauty and the highly acclaimed hospitality of its people have been luring foreign tourists, drawing in record numbers this year. But aside from the pristine white beaches and amazing landscapes, a growing number of foreigners are also visiting the Philippines mainly for another reason: to avail of more affordable [...]

By | September 27th, 2013|Uncategorized|

The Milano Residences Construction Updates (Sept 2013)

The Milano Residences commences formworks on the 29th floor Century City’s 53-storey, Italian-inspired tower has progressed to formworks and structural concreting works up to its 29th floor. Other activities on Milano’s various levels include the laying-out of unit partitions, plastering of columns, and the installation of electrical and sanitary pipelines. The Milano Residences is slated [...]

By | September 26th, 2013|Uncategorized|

Century Properties develops Centuria Medical Makati

Century Properties Group, Inc., which has made a name in the high-end residential segment of the market and international brand partnerships, is bringing its expertise in property development and management to Centuria Medical Makati, a building that houses modern facilities and specialties under one roof and that offers professional care in a hotel-like environment. “We [...]

By | September 24th, 2013|Uncategorized|

As PH vies for medical tourism market Centuria Medical sets to meet global demand

ARRIVAL of tourists and visitors in the country continues to steadily move upwards with the Department of Tourism reporting an an11 percent increase in the first seven months of 2013. It expects the numbers to reach 8 million by 2015. It is not only the pristine white beaches and amazing landscapes that are luring foreigners, [...]

By | September 24th, 2013|Uncategorized|

BMW’s Biggest Showroom in PH to Rise in Bonifacio

THE distributor of BMW in the Philippines last week held a ground-breaking ceremony at the site of what will be the auto brand’s biggest showroom in the country. Set to open in 2015 is BMW Bonifacio Global City, which will be housed within an ultra-modern and environment-friendly 23-story building at the corner of 3rd Avenue [...]

By | September 24th, 2013|Uncategorized|

BMW breaks ground on BGC showroom

Asian Carmakers Corporation (ACC), official BMW importer and distributor held the groundbreaking for its upcoming showroom at the Bonifacio Global City. On the site, located at the corner of 3rd Avenue and 27th Street, will rise a 23-story building penned by Singapore-based Pomeroy Studio and built in partnership with the Century Properties Group. BMW will [...]

By | September 24th, 2013|Uncategorized|

Centuria Medical Makati to meet demand in medical tourism

Tourist arrivals in the Philippines are on an upswing, with the Department of Tourism reporting an 11 percent increase on foreign tourist arrivals in the country in the first seven months of 2013. It expects the numbers to reach 8 million by 2015. It is not only the pristine white beaches and amazing landscapes that [...]

By | September 20th, 2013|Uncategorized|

Tourism needs infrastructure boost

Tourism will be the main driver of the country’s progress, but the country would not be able to generate more tourism arrivals because of lack of quality airports, mass transportation system and wider road networks, said Jose EB Antonio, Century Properties Group chairman and chief executive. Antonio told The Manila Times that the country needs [...]

By | September 13th, 2013|Uncategorized|

Knightsbridge Residences Construction Update (July-August 2013)

Knightsbridge Residences on track for completion in December Construction activities at the Knightsbridge Residences, the second tower at Century City Makati, continue in preparation for the tower’s completion at the end of the year. Ceiling works at typical floors of the building are in progress. The residential spaces at the higher levels progress with tiling [...]

By | September 5th, 2013|Uncategorized|

Centuria Medical Makati Construction Update (July 2013)

Centuria Medical Makati pours concrete for its final floor in July Century City’s medical-IT building is weeks away from structural completion as concrete pouring has commenced for the 28th floor—its topmost floor—this month. The topping off for Centuria is targeted at the end of August. Basement levels are ready to be painted, while the mock-up [...]

By | September 4th, 2013|Uncategorized|